Request for Proposal (RFP) - Asbestos Abatement of Vacant Buildings

Request for Proposal (RFP)

Asbestos Abatement of Vacant Buildings

Ross County Land Reutilization Corporation (RCLRC) is seeking a qualified environmental professional or qualified firm to conduct asbestos abatement of the structure on the following property:

Address:

101 Prospect Street,

Chillicothe,

OH 45601

Parcel Number:

30-5445003.000

 

approx..

Propertv Size:

Use:

 

 

Address:

69 South Hickory Street, Chillicothe, OH 45601

Parcel Number:

30-5510009.000

Property Size:

Total Living Area - 2584 square feet (approx..)

Use:

Currently Vacant, 2 Story Home

*Special Note:

This building consists of two unique postal addresses and each address must be invoiced separately.

 

 

Address:

69-1/2 South Hickory Street, Chillicothe, OH 45601

Parcel Number:

30-5510009.000

Property Size:

Total Living Area-2584 square feet (approx.)

Use:

Currently Vacant, 2 Story Home

*Special Note:

This building consists of two unique postal addresses and

each address must be invoiced separately.

 

A pre-demolition asbestos survey was completed on each parcel by Industrial Insulation Specialists and their survey results are included as Attachments A-C of this RFP.

Contractor Requirements:

Contractor must be licensed and certified by the State of Ohio to conduct asbestos abatement projects. All persons working on any asbestos abatement project on Contractor's behalf must also be licensed and certified by the State of Ohio.

 

Scope of Services:

Contractors interested in obtaining a contract with RCLRC for providing asbestos abatement shall prepare a written proposal to include, but not limited to, the following:

  • A quote on the removal of the asbestos identified in the asbestos survey repmis (Attachments A-C).
  • Removal and disposition of asbestos shall be in accordance with industrial standards as well as all Federal, State, and local regulations.
  • All materials identified as asbestos containing must be removed and disposed of by properly trained personnel.

 

Insurance:

Contractor and all tiers of Subcontractors shall at all times during the period in which the Contract is in force and effect, provide and maintain the following insurance at their own expense. All insurance shall be purchased from insurance carriers authorized to do business in the State of Ohio. All insurance required herein shall be written on an "occurrence" basis and not a "claims-made" basis. In no event shall work be performed until the required evidence of insurance has been furnished. If Contractor fails to obtain or maintain the required insurance, the RCLRC shall have the right to treat such failure as a material breach of contract and to exercise all appropriate rights and remedies. The insurance shall provide for at least thirty (30) days prior written notice to be given to the RCLRC in the event coverage is materially changed, canceled or non-renewed.

The Contractor shall not commence work under this contract until he has obtained all insurance required herein and such insurance has been approved by the Owner, nor shall the Contractor allow any subcontractor to commence work on his subcontract until all similar insurance required coverage of the subcontractor has been so obtained and approved.

Compensation Insurance. The Contractor shall take out and maintain during the life of this contract, Workmen's Compensation Insurance for all of his employees employed at the site of the project and, in case any work is sublet, the Contractor shall require the subcontractor similarly to provide Workmen's Compensation Insurance for all the latter's employees unless such employees are covered by the protection afforded by the Contractor.

 

Comprehensive Liability Insurance. Indemnification: The contractor shall fully indemnify and save and hold the RCLRC free and harmless from and against any and all claims, damages, losses, liability, and judgments for personal injuries (including death) and prope1iy damage, whether occurring to the persons or properties of the Contractor, his agents or employees, or of subcontractors, if any, or their agents or employees, or any other persons, including the city, arising out of or in connection with the work called for by the contract, or occurring by reason of, or resulting from or occasioned or caused in whole or in part by, any act or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, or (as to personal injuries, including death, to the Contractor or his employees, or subcontractors or their employees) of the RCLRC or its agents or employees or of any other person (s), whether in the execution or in the guarding of the work or otherwise, and free and harmless from and against all claims for payments of Workmen's Compensation premiums (other than the RCLRC's) including the defending of any and all litigation with regard to any of the claims referred to anywhere above in this paragraph. In any and all claims against the RCLRC or any of its agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation under the


next preceding paragraphs shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor or any subcontractor under Workmen's Compensation acts, disability benefit acts, or other employee benefit acts.

 

Liability Insurance. The Contractor shall maintain such insurance as will protect him from claims under Workmen's Compensation acts and from any claims for damages for personal injury, including death, which may arise from operations under this contract, whether such operations be by himself or by any subcontractor or anyone directly or indirectly employed by either of them. The Contractor shall provide original ce1iificate of insurance naming Ross County Land Reutilization Corporation as additional insured.

 

The Contractor shall secure and maintain insurance of and in the following types and amounts.

 

(i)                   Comprehensive Liability. (to also include contractual protection covering the liability assumed by the contractor under the terms of this article.)

Each occurrence           $2,000,000 Aggregate                      $4,000,000

 

(ii)                Pollution Liability

Each occurrence           $2,000,000 Aggregate                      $4,000,000

 

(iii)  Automobile Liability. (To include coverage of vehicles hired by the Contractor, and vehicles owned by the Contractor's employees and used in his business, as well as those owned by the Contractor.)


Personal Injury - each person

- each accident Prope1iy Damage - each accident


$1,000,000

$1,000,000

$1,000,000


 

The bidder's financial ability to complete the contract successfully and on time without res01i to its surety. Ohio Department of Health Asbestos Abatement Contractor's Licenses.

Content and Format of Proposals

The proposers interested in this project shall submit one (1) printed copy of the proposal package to meet the requirements below. The proposal package shall include, but not be limited to, the following:

  1. Provide an itemized fee schedule for the requested services.
  2. Provide a written statement outlining the timeline as well as an estimated completion date.
    1. Provide license numbers or copies of registration ce1iificates, as appropriate, for asbestos abatement supervisors and workers.

Timeline:

RFP Issued: Proposals are Due: Notice to Proceed:

Friday, February 15, 2019

Friday, February 22, 2019 at 4:00 p.m.

Monday, February 25, 2019

Questions can be directed by email to Traci Harris, Executive Director, at traci.harris@chillicotheoh.gov. Proposals must be signed and submitted to RCLRC, Attn: Traci Hanis, 35 S. Paint St., Chillicothe, OH 45601 in a sealed envelope and must be marked "RFP # 2

-Asbestos Abatement" Each Proposal must contain the full name of the party or parties submitting the Proposal and all persons interested therein. No Proposer shall withdraw his Proposal after the actual opening thereof. Ross County Land Reutilization reserves the right to reject any or all bids, waive inegularities in any Proposal, and to accept any Proposal that is deemed by the Corporation to be in the best interests of the Corporation.

SCOPE OF WORK

Contractor shall establish a contained work site as required by 29 C.F.R., Part 1926.1101 at the Site. Contractor shall be responsible for proper abatement and disposal of any asbestos containing material as identified by the attached asbestos report.

CONTRACTOR MUST PROVIDE OWNER WITH LANDFILL RECEIPTS FROM ABATEMENT.

Contractor will provide, if required, a negative pressure air filtration system to be operating during the hazardous materials activities. Provide final clearance air sampling upon completion of hazardous materials abatement. Contractor will provide Demolition Company and/or RCLRC with a ce1iificate of clearance as prescribed by law stating that the Building if free of all hazardous materials and legally suitable for demolition. Contractor will accomplish the disposal of all hazardous materials-accompanying debris to an EPA-approved landfill with copies of all manifests, transit and trip receipts confirming chain of custody of all hazardous materials.

Contractor proposes and agrees to furnish all labor, supervision, expe1iise, material, equipment, transpmiation and disposal necessary to complete all asbestos remediation work for RCLRC as described in the pertinent Asbestos Survey/Inspection Report (Attachments A-C) for the fixed price stated in this bid proposal.

Contractor will complete Notification of Demolition and Renovation and submit to the Ohio Environmental Protection Agency. Cost must be included within contractor's proposed bid.

Contractor will communicate with Demolition Contractor any and all pe1iinent information regarding the asbestos removal and notification to the Ohio Environmental Protection Agency.

PROJECT DATE(S): Commencement and completion of work shall be completed on all properties listed herein no later than March 25, 2019.


BIDDER'S CERTIFICATION

The bidder hereby acknowledges the following:

The bidder has read and understands the technical specifications and agrees to comply with all requirements set forth therein.

The bidder represents that the bid is based on the standards specified in the technical specification and all applicable local, state, and federal regulations.

The bidder understands that the award of this project will require coordination with the demolition contractor(s) on this project and may require interface, disruption, hindrance or delay in the progress of the specified work.

The bidder certifies that upon award of the contract, the Contractor will make good faith efforts to ensure the Contractor's employee's will not, while working on the project site, possess, purchase, use, or transfer illegal drugs or alcohol or abuse prescription drugs in any way.

The bidder agrees to furnish any information requested by the RCLRC to evaluate the responsibility of the bidder.

The bidder agrees to furnish the RCLRC with landfill receipts for each site and copies of the Ohio EPA Notifications of Demolition and Renovation prior upon completion and prior to receiving payment.


BID FORM

Project Name: Asbestos Abatement-Hickory, Prospect and Fourth Locations of Project:                                     69 S. Hickory Street, Chillicothe, OH 45601

69-1/2 S. Hickory Street, Chillicothe, OH 45601 101 Prospect Street, Chillicothe, OH 45601

 

Project will be awarded as a whole, however Bidder shall list price for each location listed above separately on bid form and final invoice.

 

PROPERTY ADDRESS

BID FOR ASBESTOS ABATEMENT

69 S. Hickory Street

 

69-1/2 S. Hickory Street

 

101 Prospect Street

 

TOTAL BID AMOUNT

$


DRUG FREE WORKPLACE COMPLIANCE

Ross County Land Reutilization Corporation is a recipient of federal funds and is required to comply with the Drug Free Workplace Act of 1988. The RCLRC is concerned with the effects drug or alcohol abuse can have on employees, their families, and the employee's ability to perform their work safely and efficiently.

Before RCLRC enters into a contract for the purchase of materials, equipment, supplies, contracts, or insurance, or other services, the contractor must agree to the following:

  1. That the contractor or subcontractor employed by RCLRC recognizes alcoholism and drug addiction as illnesses which are treatable, and encourages employees who may have an alcohol or drug problem to seek professional treatment or assistance on their own initiative.
  2. That the unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance by any employee of a contractor or subcontractor which takes place in whole or in part in the RCLRC's workplace is strictly prohibited and may result in criminal prosecution and discipline which may include termination of contract.
    1. That is an employee of the contractor or subcontractor is convicted of any Federal or State criminal drug statute for a workplace related drug offense, the contractor or subcontractor shall notify the RCLRC Director of such within five (5) calendar days.

THE UNDERSIGNED AFFIRMS THAT THE NAMED CONTRACOT COMPLIES WITH ALL OF THE REQUIREMENTS SET OUT ABOVE, AND THAT SUCH CONTRACTOR WILL CONTINUE TO COMPLY WITH THESE REQUIREMENTS FOR THE TERM OF THE CURRENT CONTRACT WITH THE ROSS COUNTY LAND REUTILIZATION CORPORATION AND FOR THE DURATION OF ALL FUTURE CONTRACTS WITH THE RCLRC.

 

Company                                                                                                                     _ Address ---------------------------

Signature                                                                                                                     _

Print Name                                                                                                                            Date ----------


CERTIFICATION OF PAID REAL ESTATE TAXES

 

 

In compliance with the ROSS COUNTY LAND REUTILIZATION CORPORATION purchasing policies, the following certification on property owned within Ross County must be completed and returned with the quotations in accordance with the RCLRC's policy on delinquent property taxes.

 

 

  1.             "The bidder(s) or corporation hereby certifies that all real estate taxes within Ross

County are paid."

  1.             "No prope1iy is owned by the bidder(s) or corporation within Ross County."

 

 

DATE:                                                   _

 

 

COMPANY:                                                                                  _

 

 

PHONE: ------------

 

FAX:  ------------

 

SIGNATURE:   ---------------------

 

NAME  OF  SIGNEE: -------------------

 

TITLE OF SIGNEE: ------------------

 

EMAIL:    ---------------------


 

 

NON-COLLUSION AFFIDAVIT OF PRIME BIDDER

State of ---------

{SS.

County of                                   _

                                                             ,being first duly sworn, deposes and says that:

1)      He is the                                               of                                                                _ (Title)                                                             (Company Name)

The Bidder that has submitted the attached bid;

2)      He if fully informed regarding the preparation and contents of the attached Bid(s) and of all pertinent circumstances respecting such Bid(s);

 

3)      Such bid(s) is/are genuine and is/are not a collusive or sham Bid(s);

 

4)      Neither the said bidders finn nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firm, or person to submit a collusive or sham Bid(s) in connection with the Contract for which the attached Bid(s) has/have been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement, or collusion or communication or conference with any other Bidder, firm, or person to fix the price or prices in the attached Bid(s) or of any other Bidder, or to fix overhead, profit, or cost elements of the Bid price9s) of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against Ross County Land Reutilization Corporation or any person interested in the proposed Contract; and

 

5)      The price or prices quoted in the attached Bid(s) are fair and proper and are not the result of any collusion, conspiracy, connivance, or unlawful agreement on the pati of the Bidder or any of its agents, representatives, owner's employees, or parties in interest, including this affidavit.

 

 

(Signed)                (Contractor)

 

 

Subscribed and sworn to before me this              day of                                      ,20   

 

 
   

Notary

My commission expires                                                                  


1.1.S 

INDUSTRIAL INUSLATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 C. (740) 497-8610

Asbestos Pre-Demolition Survey

Jan. 27, 2019 

Ms. Harris
Development Director
City of Chillicothe, Ohio 45601 (740) 775-3995

Project: 101 Prospect Street (Residential) Chillicothe,Ohio 45601

Dear Ms. Harris,

1.1.S has completed the pre-demolition survey for asbestos-containing materials (ACM) at the above- referenced location. This report/survey includes the procedure and methodologies followed, analytical laboratory and applicable conclusions and recommendations.

101 Prospect Street Chillicothe, Ohio has windows that must be removed before the demolition may take place. A notification of Demolition and Renovation/Abatement form must be sent to the Ohio EPA, at ( Ohio EPA P.O. 1049 Columbus, Ohio 43216).

Roof, flooring and other non-friable materials are considered EPA NESHAP Category I non-friable ACMs and according to the EPA, may be left in place during the scheduled demolition of this particular structure.

--

 

Feel free to contact us if you have any questions, 740-663-7368 or iis.mike@yahoo.com Thank you,

Mike Tatman 1.1.S


1.1.S

INDUSTRIAL INUSLATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 C. (740) 497-8610

Asbestos Pre-Demolition Survey

101 Prospect Street
Chillicothe, Ohio 45601

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601 iis.mike@yahoo.com


Asbestos Pre-Demolition

 (1)   Introduction.

The purpose of this survey is to locate and identify Asbestos Containing Materials (ACM) property be for demolition of this structure.

 1.1.S scope of services for this project consisted of the following tasks.

  1. Visual observations for any and all ACM
  2. Bulk Sampling of suspect ACM.
  3. Analysis of bulk samples.
  4. Report all finding.
  5. Air testing during Demolition if needed.
  6. Final Report/Survey.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor 159 James Road
Chillicothe, Ohio 45601
(740) 663-7368   (740) 497-8610

Asbestos Pre-Demolition Survey

(2)   Facility Descriptions

This survey was performed by 1.1.S on 1-9-19


Site Name.          Residential Home
Address.              101 Prospect St. Chillicothe,Ohio 
Cons. Date.        1900s
Sizes.                     1040'sq including the basement(520'sq
Usage.                   Home
Roof.                      Asphalt (520'sq)
Interior.               Wood/Carpet/Drywall/Plaster/Glass/BlockNinyl
Exterior.              Glass/Asphalt/Plaster/Chalk/Brick/Block
Heating.               Basement Gas Furnance
Cooling.               Heat pump outside

 

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601 iis.mike@yahoo.com

Asbestos Pre-Demolition Survey

 (3) Asbestos-Containing/Suspect Materials.

 IIS obtained (16) bulk sample from 101 Prospect Street and (14) sampled were analyzed by Polarized Light Microscopy (PLM) by a thrid party Lab.

Suspect Materials.

  1. Windows
  2. Roofing
  3. Paints
  4. Drywall/Plasters
  5. Heating/Cooling
  6. Sink
  7. Flooring
  8. Insulation
  9. Ceiling
  10. Electric
  11. Misc.

   
   
 
   

1.1.S

 

INDUSTRIAL INSULATION SPECIALISTS 
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368   (740) 497-8610


Asbestos  Pre-Demolition Survey

 (4) Conclusions and Recommendations

 101 Prospect St., Chillicothe Ohio

5 Windows (85'1f) must be removal be for Demolition.

Prior to Demolition.

 The Ohio EPA requires 10 working day prior notifications for any structures that are scheduled to be demolished or burned.

 NESHAP category I & II ACMs must be removed from the designated building prior to demolition. The removal of any ACMs must be performed by a licensed Asbestos (Ohio EPA) contractor.

During Demolition.

 When Demolition by toppling occurs, adequate wetting must be employed to suppress the dust and reasonable enclosures for dust emission control may be employed if compatible.

 
   

 

1.1.S 

INDUSTRIAL INSULATION SPECIALISTS 
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 (740) 497-8610

 Asbestos Pre-Demolition Survey

(5) Survey Methods

The sampling protocol used in this asbestos survey is listed in the Tile 40 Code of Federal Requlations(CFR), Part 763 for suspect ACMs. The EPA requlations require that sample locations be randomly selected. Suspect asbestos-containing building materials were identified and sample of each different type material were obtained.

 The bulk sampling procedure utilized for collection of samples suspected of being ACMs required the establishment of a homogeneous sampling areas.

A homogeneous sampling area is defined as an of friable or non-friable materials of similar type that appeared to be applied or constructed during the same general period of time. This the most acceptable and cost effective method for sampling of suspect ACMs building materials.

Materials visibly and completely identifable as non­ asbestos,(wood,rubber,glass,metal,foams,fiberglass and etc) were not sampled.

Laboratory Analysis

Samples are collected and sent to a 3rd party Lab. Bulk sample were analyzed by polarized light microscopy (PLM) using EPA method 600-R93-116 incorporating visual estimate of identifiable material percentage. Any material that contains less than one percent(<1%) may be left in place during Demo.


   
   
 
   

 

1.1.S

INDUSTRIAL INSULATION SPECIALISTS 
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601 iis.mike@yahoo.com

 

 Asbestos Pre-Demolition Survey

 (6) Assumption and Limitations

 It should be noted that 1.1.S does not core sample roofings products to aviod creating roof leaks. Roofing materrials and others suspect ACMs found behind walls or hidden cavites should be assumed or not to contain ACM and handled and disposed accordingly.

 The results and finding and conclusions expressed in this report are based  only on condition observed during our survey of the accessible areas of  this building(s). 1.1.S in this report makes no assumption as to the past conditions or future occurrence. The finding of this report represents our professional judgement, no orther warranty is expressed or implied.

 This report is prepared to assist the building owner, architect, construction manger, general contractors and potential asbestos contractors in locating ACM. This report is not intended as a bidding document or as a project specification.

 Our professional services have been performed, our finding obtained and our conclusions and recommendation prepared in accordance or as a project specification.

 *** This statement is in lieu of other statement either expressed or implied. This report does not warrant against operation or conditions present of any type or location not investigated.


1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 (740) 497-8610

(7) Landfill and Waste

 Non-friable ACM debris dislodged during demolition can be disposed off in a sanitary landfill that accepts ACM demolition and constrution debris waste within the framework of local/state regulations. Please check with your landfill regarding their policy on acceptance of such waste,prior to demolition project.

 Non-friable ACM debris mixed with demolition debris should not be used as fill material on-site nor should it be sold or given away.

 If the demolition contractor changes the means and methods of the demolition and the environment consultant it the opinon that Category I non-friable materials are being made friable, or visible dust emissions are being generated, the project may be stopped.

 In these situation a revised notification for removal/clean up of non-friable ACM may be necessary and the removal work will then be needed to completed by a Ohio EPA licensed abatement contractor.


1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601 iis.mike@yahoo.com

(8) Common Asbestos terms.

NAO          No asbestos detected
NS               Not sampled
ACM          Asbestos containing materials 
RACM      Regulated asbestos containing materials 
PACM      Presumed asbestos containing materials
TSI             Piping,tapes,boiler and etc. Insulation materials 
EPA           Environmental Protection Agency
                     Ohio 614-466-0061 (Air Division

 


A#a6hm in+ B

1.1.S

INDUSTRIAL INUSLATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 C. (740) 497-8610 

Asbestos Pre-Demolition Survey

Jan. 27, 2019

Ms. Harris
Development Director

City of Chillicothe, Ohio 45601 (740) 775-3995

Project:    69 Hickory Street (Apartment unit 1)
                     Chillicothe,Ohio 45601

Dear Ms. Harris,

1.1.S   has completed the pre-demolition survey for asbestos-containing materials (ACM) at the above- referenced location. This report/survey includes the procedure and methodologies followed, analytical laboratory and applicable conclusions and recommendations.

69 Hickory( Unit 1) Street Chillicothe, Ohio has abestos tape on the duct work and it must be removed be for Demolition. A notification of Demolition and Renovation/Abatement form must be sent to the Ohio EPA, at ( Ohio EPA P.O. 1049 Columbus, Ohio 43216).

Roof, flooring and other non-friable materials are considered EPA NESHAP Category I non-friable ACMs and according to the EPA, may be left in place during the scheduled demolition of this particular structure.

Feel free to contact us if you have any questions, 740-663-7368 or iis.mike@yahoo.com Thank you,

Mike Tatman 1.1.S


1.1.S

INDUSTRIAL INUSLATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 C. (740) 497-8610

Asbestos Pre-Demolition Survey

69 Hickory Street
Chillicothe, Ohio 45601

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601 iis.mike@yahoo.com

Asbestos Pre-Demolition

(1)   Introduction.

The purpose of this survey is to locate and identify Asbestos Containing Materials (ACM) property be for demolition of this structure.

I.I.S scope of services for this project consisted of the following tasks.

  1. Visual observations for any and all ACM
  2. Bulk Sampling of suspect ACM.
  3. Analysis of bulk samples.
  4. Report all finding.
  5. Air testing during Demolition if needed.
  6. Final Report/Survey.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601
(740) 663-7368   (740) 497-8610

Asbestos Pre-Demolition Survey

(2)   Facility Descriptions

This survey was performed by 1.1.S on 1-9-19

Site Name.          Apartments Unit (1)
Address.              69 Hickory St. Chillicothe,Ohio
Cons. Date.        1900s
Sizes.                      1452'sq including the basement(163'sq)
Usage.                   Home
Roof.                      Asphalt (1452'sq)
Interior.              Wood/Carpet/Drywall/Plaster/Glass/BlockNinyl           Exterior.            Glass/Asphalt/Plaster/Chalk/Wood/Block
Heating.            Basement Gas Furnace
Cooling.            N/A'


1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601 iis.mike@yahoo.com

Asbestos Pre-Demolition Survey

(3) Asbestos-Containing/Suspect Materials.

IIS obtained (24) bulk sample from 69 Hickory Street and (24) sampled were analyzed by Polarized Light Microscopy (PLM) by a thrid party Lab.

Suspect Materials.

  1. Windows
  2. Roofing
  3. Paints
  4. Drywall/Plasters
  5. Heating/Cooling
  6. Sink
  7. Flooring
  8. Insulation
  9. Ceiling
  10. Electric
  11. Misc.

 

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368  (740) 497-8610

Asbestos  Pre-Demolition Survey

(4) Conclusions and Recommendations

69 Hickory St., Chillicothe Ohio

Asbestos in basement ductwork (100' less that 'If) must be removal be for Demolition.

Prior to Demolition.

The Ohio EPA requires 10 working day prior notifications for any structures that are scheduled to be demolished or burned.

NESHAP category I & II ACMs must be removed from the designated building prior to demolition. The removal of any ACMs must be performed by a licensed Asbestos (Ohio EPA) contractor.

During Demolition.

When Demolition by toppling occurs, adequate wetting must be employed to suppress the dust and reasonable enclosures for dust emission control may be employed if compatible.

 

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 (740) 497-8610

Asbestos Pre-Demolition Survey

(5) Survey Methods

The sampling protocol used in this asbestos survey is listed in the Tile 40 Code of Federal Requlations(CFR), Part 763 for suspect ACMs. The EPA requlations require that sample locations be randomly selected. Suspect asbestos-containing building materials were identified and sample of each different type material were obtained.

The bulk sampling procedure utilized for collection of samples suspected of being ACMs required the establishment of a homogeneous sampling areas.

A homogeneous sampling area is defined as an of friable or non-friable materials of similar type that appeared to be applied or constructed during the same general period of time. This the most acceptable and cost effective method for sampling of suspect ACMs building materials.

Materials visibly and completely identifable as non­ asbestos,(wood,rubber,glass,metal,foams,fiberglass and etc) were not sampled.

Laboratory Analysis

Samples are collected and sent to a 3rd party Lab. Bulk sample were analyzed by polarized light microscopy (PLM) using EPA method 600-R93-116 incorporating visual estimate of identifiable material percentage. Any material that contains less than one percent(<1%) may be left in place during Demo.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601 iis.mike@yahoo.com

Asbestos Pre-Demolition Survey

(6) Assumption and Limitations

It should be noted that 1.1.S does not core sample roofings products to aviod creating roof leaks. Roofing materrials and others suspect ACMs found behind walls or hidden cavites should be assumed or not to contain ACM and handled and disposed accordingly.

The results and finding and conclusions expressed in this report  are based only on condition observed during our survey of the accessible areas of  this building(s). 1.1.S in this report makes no assumption as to the past conditions or future occurrence. The finding of this report represents our professional judgement, no orther warranty is expressed or implied.

This report is prepared to assist the building owner, architect, construction manger, general contractors and potential asbestos contractors in locating ACM. This report is not intended as a bidding document or as a project specification.

Our professional services have been performed, our finding obtained and our conclusions and recommendation prepared in accordance or as a project specification.

*** This statement is in lieu of other statement either expressed or implied. This report does not warrant against operation or conditions present of any type or location not investigated


1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 (740) 497-8610 

(7) Landfill and Waste

Non-friable ACM debris dislodged during demolition can be disposed off in a sanitary landfill that accepts ACM demolition and constrution debris waste within the framework of local/state regulations. Please check with your landfill regarding their policy on acceptance of such waste,prior to demolition project.

Non-friable ACM debris mixed with demolition debris should not be used as fill material on-site nor should it be sold or given away.

If the demolition contractor changes the means and methods of the demolition and the environment consultant it the opinon that Category I non-friable materials are being made friable, or visible dust emissions are being generated, the project may be stopped.

In these situation a revised notification for removal/clean up of non-friable ACM may be necessary and the removal work will then be needed to completed by a Ohio EPA licensed abatement contractor.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601 iis.mike@yahoo.com

(8) Common Asbestos terms.

NAD          No asbestos detected
NS               Not sampled
ACM          Asbestos containing materials
RACM       Regulated asbestos containing materials
PACM        Presumed asbestos containing materials
TSI              Piping,tapes,boiler and etc. Insulation materials
EPA             Environmental Protection Agency
                      Ohio 614-466-0061 (Air Division)

       
       

 

Ail- c}) W\ nt  c  

1.1.S

INDUSTRIAL INUSLATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 C. (740) 497-8610

Asbestos Pre-Demolition Survey

Jan. 27, 2019

Ms. Harris
Development Director
City of Chillicothe, Ohio 45601 (740) 775-3995

Project:     69 1/2 Hickory Street (Apartment unit 2) Chillicothe,Ohio 45601

Dear Ms. Harris,

1.1.S has completed the pre-demolition survey for asbestos-containing materials (ACM) at the above- referenced location. This report/survey includes the procedure and methodologies followed, analytical laboratory and applicable conclusions and recommendations.

69 1/2 Hickory( Unit 2) Street Chillicothe, Ohio has abestos tape on the duct work and it must be removed be for Demolition. A notification of Demolition and Renovation/Abatement form must be sent to the Ohio EPA, at ( Ohio EPA P.O. 1049 Columbus, Ohio 43216).

Roof, flooring and other non-friable materials are considered EPA NESHAP Category I non-friable ACMs and according to the EPA, may be left in place during the scheduled demolition of this particular structure.

Feel free to contact us if you have any questions, 740-663-7368 or iis.mike@yahoo.com

Mike Tatman 1.1.S


1.1.S

INDUSTRIAL INUSLATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 C. (740) 497-8610

Asbestos Pre-Demolition Survey

69 1/2 Hickory Street
Chillicothe, Ohio 45601


1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601 iis.mike@yahoo.com

Asbestos  Pre-Demolition

(1)   Introduction.

The purpose of this survey is to locate and identify Asbestos Containing Materials (ACM) property be for demolition of this structure.

1.1.S scope of services for this project consisted of the following tasks.

  1. Visual observations for any and all ACM
  2. Bulk Sampling of suspect ACM.
  3. Analysis of bulk samples.
  4. Report all finding.
  5. Air testing during Demolition if needed.
  6. Final Report/Survey.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601
(740) 663-7368  (740) 497-8610

Asbestos Pre-Demolition Survey

(2)   Facility Descriptions

This survey was performed by 1.1.S on 1-9-19

Site Name.          Apartments Unit (2)
Address.              69 1/2 Hickory St. Chillicothe,Ohio
Cons. Date.        1900s
1Sizes.                   132'sq including the basement(163'sq)
Usage.                    Home
Roff.                        Asphalt (1452'sq)
Interior.                Wood/Carpet/Drywall/Plaster/Glass/BlockNinyl          Exterior.               Glass/Asphalt/Plaster/Chalk/Wood/Block
Heating.                Gas Furnace in closet
Cooling.                 N/A'


1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe, Ohio 45601 iis.mike@yahoo.com

Asbestos Pre-Demolition Survey

(3) Asbestos-Containing/Suspect Materials.

IIS obtained (24) bulk sample from 69 1/2 Hickory Street and (24) sampled were analyzed by Polarized Light Microscopy (PLM) by a thrid party Lab

Suspect Materials.

  1. Windows
  2. Roofing
  3. Paints
  4. Drywall/Plasters
  5. Heating/Cooling
  6. Sink
  7. Flooring
  8. Insulation
  9. Ceiling
  10. Electric
  11. Misc.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368  (740) 497-8610

Asbestos  Pre-Demolition Survey

(4) Conclusions and Recommendations

69 1/2 Hickory St. Chillicothe Ohio

Asbestos tape in basement ductwork (100' less that 'If) must be removal be for Demolition.

Be careful Heavy fire Damage back area not safe.

Prior to Demolition.

The Ohio EPA requires 10 working day prior notifications for any structures that are scheduled to be demolished or burned.

NESHAP category I & II ACMs must be removed from the designated building prior to demolition. The removal of any ACMs must be performed by a licensed Asbestos (Ohio EPA) contractor.

During Demolition.

When Demolition by toppling occurs, adequate wetting must be employed to suppress the dust and reasonable enclosures for dust emission control may be employed if compatible.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 (740) 497-8610

Asbestos Pre-Demolition Survey

(5) Survey Methods

The sampling protocol used in this asbestos survey is listed in the Tile 40 Code of Federal Requlations(CFR), Part 763 for suspect ACMs. The EPA requlations require that sample locations be randomly selected. Suspect asbestos-containing building materials were identified and sample of each different type material were obtained.

The bulk sampling procedure utilized for collection of samples suspected of being ACMs required the establishment of a homogeneous sampling areas.

A homogeneous sampling area is defined as an of friable or non-friable materials of similar type that appeared to be applied or constructed during the same general period of time. This the most acceptable and cost effective method for sampling of suspect ACMs building materials.

Materials visibly and completely identifable as non­ asbestos,(wood,rubber,glass,metal,foams,fiberglass and etc) were not sampled.

Laboratory Analysis

Samples are collected and sent to a 3rd party Lab. Bulk sample were analyzed by polarized light microscopy (PLM) using EPA method 600-R93-116 incorporating visual estimate of identifiable material percentage. Any material that contains less than one percent(<1%) may be left in place during Demo.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601 iis.mike@yahoo.com

Asbestos Pre-Demolition Survey

(6) Assumption and Limitations

It should be noted that 1.1.S does not core sample roofings products to aviod creating roof leaks. Roofing materrials and others suspect ACMs found behind walls or hidden cavites should be assumed or not to contain ACM and handled and disposed accordingly.

The results and finding and conclusions expressed in this report are based only  on condition observed during our survey of the accessible areas of  this building(s). 1.1.S in this report makes no assumption as to the past conditions or future occurrence. The finding of this report represents our professional judgement, no orther warranty is expressed or implied.

This report is prepared to assist the building owner, architect, construction manger, general contractors and potential asbestos contractors in locating ACM. This report is not intended as a bidding document or as a project specification.

Our professional services have been performed, our finding obtained and our conclusions and recommendation prepared in accordance or as a project specification.

*** This statement is in lieu of other statement either expressed or implied. This report does not warrant against operation or conditions present of any type or location not investigated.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601
(740) 663-7368 (740) 497-8610

(7) Landfill and Waste

Non-friable ACM debris dislodged during demolition can be disposed off in a sanitary landfill that accepts ACM demolition and constrution debris waste within the framework of local/state regulations. Please check with your landfill regarding their policy on acceptance of such waste,prior to demolition project.

Non-friable ACM debris mixed with demolition debris should not be used as fill material on-site nor should it be sold or given away.

If the demolition contractor changes the means and methods of the demolition and the environment consultant it the opinon that Category I non-friable materials are being made friable, or visible dust emissions are being generated, the project may be stopped.

In these situation a revised notification for removal/clean up of non-friable ACM may be necessary and the removal work will then be needed to completed by a Ohio EPA licensed abatement contractor.

1.1.S

INDUSTRIAL INSULATION SPECIALISTS
Insulation/Abatement Contractor
159 James Road
Chillicothe,Ohio 45601 iis.mike@yahoo.com

(8) Common Asbestos terms.

NAD          No asbestos detected
NS              Not sampled
ACM         Asbestos containing materials
RACM      Regulated asbestos containing materials
PACM      Presumed asbestos containing materials
TSI            Piping,tapes,boiler and etc. Insulation materials
EPA           Environmental Protection Agency
                    Ohio 614-466-0061(AirDivision)

 

 


 

 


 

 

 



 

35 S. Paint St. Chillicothe, OH 45601